Prepared by Quick Supply and Services SARL · Updated
QSS’s road portfolio includes the 51 km Mukabe–Kasari route and the 31 km Munema–Kamalenge route. Project photos show cut slopes and sections of formed earth roadbed. For a new earth road in the DRC, those features illustrate the information needed before comparing earthworks quotations.
Define the route and its use
Roads of equal length can require very different work depending on the terrain, ground and expected traffic. Share the alignment, available profiles and junctions with existing roads. Identify which sections need to stay open and where equipment and delivery vehicles can reach the work.
Consider drainage and material sources
Identify low points and natural crossings before specifying runoff arrangements. State the proposed materials and their known sources. Roadbed geometry, layer materials and density criteria need to reflect the road’s intended use. Cut and fill quantities can be refined when alignment and level data are available.
Prepare a roadworks enquiry
Send a location plan, route length, available technical documents and the proposed work period. Distinguish a new build from rehabilitation or grading. The work and equipment needed vary with the scope.



